IDEAS home Printed from https://ideas.repec.org/a/inm/ormnsc/v23y1977i12p1321-1327.html
   My bibliography  Save this article

Production Runs for Multiple Products: The Two-Product Heuristic

Author

Listed:
  • Alan L. Saipe

    (York University, Canada)

Abstract

The optimal solution is presented for the problem of determining production run sizes for two products which must be produced on the same machine. This solution forms the basis for a heuristic solution to the N product problem. This heuristic provides uniformly better results than the complete-cycle heuristic for this problem. Numerical examples are presented to illustrate the method.

Suggested Citation

  • Alan L. Saipe, 1977. "Production Runs for Multiple Products: The Two-Product Heuristic," Management Science, INFORMS, vol. 23(12), pages 1321-1327, August.
  • Handle: RePEc:inm:ormnsc:v:23:y:1977:i:12:p:1321-1327
    DOI: 10.1287/mnsc.23.12.1321
    as

    Download full text from publisher

    File URL: http://dx.doi.org/10.1287/mnsc.23.12.1321
    Download Restriction: no

    File URL: https://libkey.io/10.1287/mnsc.23.12.1321?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Goncalves, JoseF. & Leachman, Robert C., 1998. "A hybrid heuristic and linear programming approach to multi-product machine scheduling," European Journal of Operational Research, Elsevier, vol. 110(3), pages 548-563, November.
    2. P. C. Geng & R. G. Vickson, 1988. "Two heuristics for the economic lot scheduling problem: An experimental study," Naval Research Logistics (NRL), John Wiley & Sons, vol. 35(4), pages 605-617, August.
    3. Banerjee, Avijit, 2009. "Simultaneous determination of multiproduct batch and full truckload shipment schedules," International Journal of Production Economics, Elsevier, vol. 118(1), pages 111-117, March.
    4. Robert R. Inman & Philip C. Jones & Guillermo M. Gallego, 1991. "Economic lot scheduling of fully loaded processes with external setups," Naval Research Logistics (NRL), John Wiley & Sons, vol. 38(5), pages 699-713, October.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:inm:ormnsc:v:23:y:1977:i:12:p:1321-1327. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Asher (email available below). General contact details of provider: https://edirc.repec.org/data/inforea.html .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.