Advanced Search
MyIDEAS: Login to save this article or follow this journal

Energy Efficient Operation of University Hostel Buildings Under Indoor Environmental Quality Requirements

Contents:

Author Info

  • Ahmed A. Medhat A. Fahim

    (Electro-Mechanical Research Institute, At Housing & Building National Research Center, Egypt)

  • Essam E. Khalil

    (Cairo University, Egypt)

Registered author(s):

    Abstract

    This paper investigates the influence of Indoor Environmental Quality [IEQ] requirements associated with occupation regimes on the criterion of energy demands for Heating, Ventilating and Air-Conditioning (HVAC) central systems installed in Cairo, Egypt. This paper focuses on the effects of occupation rate profiles with IEQ thermal parameters such as air dry-bulb temperatures and local air velocities. It is applied as a case study “10-Stories Hostel of 6000 m2 built-up area†that is utilized by immigrant students that migrate to Cairo for their University studies. They are termed here in this work as Egyptian Citizens [EC]. The occupation rate schedules and operation profiles for each source of heat inside space shall be incorporated to simulate the reality. These profiles and schedules should be added to the local energy code as a guideline for designers. Although in this case study the obtained results from simulation program match the total actual energy bills, sometimes, with multi-use apartments additional factors. The effect of Effective Temperatures [ET*] (temperature for constant thermal sensations) is vital as it can lead to reduce the cooling capacity by increasing the room temperature against indoor relative humidity for the same comfort sensation. These two concepts will save on the project total energy demand, in addition to introducing new design criteria for acceptable indoor conditions.

    Download Info

    If you experience problems downloading a file, check if you have the proper application to view it first. In case of further problems read the IDEAS help page. Note that these files are not on the IDEAS site. Please be patient as the files may be large.
    File URL: http://services.igi-global.com/resolvedoi/resolve.aspx?doi=10.4018/ijeoe.2012040106
    Download Restriction: no

    Bibliographic Info

    Article provided by IGI Global in its journal International Journal of Energy Optimization and Engineering (IJEOE).

    Volume (Year): 1 (2012)
    Issue (Month): 2 (April)
    Pages: 96-109

    as in new window
    Handle: RePEc:igg:jeoe00:v:1:y:2012:i:2:p:96-109

    Contact details of provider:
    Web page: http://www.igi-global.com

    Related research

    Keywords:

    References

    No references listed on IDEAS
    You can help add them by filling out this form.

    Citations

    Lists

    This item is not listed on Wikipedia, on a reading list or among the top items on IDEAS.

    Statistics

    Access and download statistics

    Corrections

    When requesting a correction, please mention this item's handle: RePEc:igg:jeoe00:v:1:y:2012:i:2:p:96-109. See general information about how to correct material in RePEc.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: (Journal Editor).

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If references are entirely missing, you can add them using this form.

    If the full references list an item that is present in RePEc, but the system did not link to it, you can help with this form.

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your profile, as there may be some citations waiting for confirmation.

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.