Advanced Search
MyIDEAS: Login to save this article or follow this journal

Identification of bottlenecks to improve equipment availability: a case study

Contents:

Author Info

  • Sarat Kumar Jena
  • Sidhartha S. Padhi
Registered author(s):

    Abstract

    In this highly competitive market where the demand for the products is increasing gradually, it is essential for a manufacturing company to reduce the production cycle time and cost accordingly. One of the methods for this is to increase the availability of process. This paper attempts to identify and quantify the causes of machine downtime in a manufacturing company. For this a four-prong approach is taken: Firstly, the major causes for the low availability of process are determined, where bearing failure is found to be the major causes of low availability. Second, combining desirability function approach and data envelopment analysis are performed to identify the sensitive input variables that affect the bearing failure. Thirdly, ordinary linear regression is used to validate the results of DEA. Lastly, some managerial implications to reduce the downtime were suggested. We have considered an electrolytic tinplating line process in a tin sheet manufacturing company as a case study.

    Download Info

    If you experience problems downloading a file, check if you have the proper application to view it first. In case of further problems read the IDEAS help page. Note that these files are not on the IDEAS site. Please be patient as the files may be large.
    File URL: http://www.inderscience.com/link.php?id=38808
    Download Restriction: Access to full text is restricted to subscribers.

    As the access to this document is restricted, you may want to look for a different version under "Related research" (further below) or search for a different version of it.

    Bibliographic Info

    Article provided by Inderscience Enterprises Ltd in its journal Int. J. of Data Analysis Techniques and Strategies.

    Volume (Year): 3 (2011)
    Issue (Month): 1 ()
    Pages: 105-116

    as in new window
    Handle: RePEc:ids:injdan:v:3:y:2011:i:1:p:105-116

    Contact details of provider:
    Web page: http://www.inderscience.com/browse/index.php?journalID=282

    Related research

    Keywords: data envelopment analysis; DEA; linear regression; machine availability; machine downtime; desirability function; bottleneck identification; bottlenecks; manufacturing equipment; bearing failure; electrolytic tinplating; tin sheet manufacturing.;

    References

    No references listed on IDEAS
    You can help add them by filling out this form.

    Citations

    Lists

    This item is not listed on Wikipedia, on a reading list or among the top items on IDEAS.

    Statistics

    Access and download statistics

    Corrections

    When requesting a correction, please mention this item's handle: RePEc:ids:injdan:v:3:y:2011:i:1:p:105-116. See general information about how to correct material in RePEc.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: (Graham Langley).

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If references are entirely missing, you can add them using this form.

    If the full references list an item that is present in RePEc, but the system did not link to it, you can help with this form.

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your profile, as there may be some citations waiting for confirmation.

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.