IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v72y2001i2p103-120.html
   My bibliography  Save this article

Mixed model assembly alternatives for low-volume manufacturing: The case of the aerospace industry

Author

Listed:
  • Heike, G.
  • Ramulu, M.
  • Sorenson, E.
  • Shanahan, P.
  • Moinzadeh, K.

Abstract

No abstract is available for this item.

Suggested Citation

  • Heike, G. & Ramulu, M. & Sorenson, E. & Shanahan, P. & Moinzadeh, K., 2001. "Mixed model assembly alternatives for low-volume manufacturing: The case of the aerospace industry," International Journal of Production Economics, Elsevier, vol. 72(2), pages 103-120, July.
  • Handle: RePEc:eee:proeco:v:72:y:2001:i:2:p:103-120
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(00)00089-X
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Nakade, Koichi & Ohno, Katsuhisa, 1999. "An optimal worker allocation problem for a U-shaped production line," International Journal of Production Economics, Elsevier, vol. 60(1), pages 353-358, April.
    2. Candace Arai Yano & Ram Rachamadugu, 1991. "Sequencing to Minimize Work Overload in Assembly Lines with Product Options," Management Science, INFORMS, vol. 37(5), pages 572-586, May.
    3. George Steiner & Scott Yeomans, 1993. "Level Schedules for Mixed-Model, Just-in-Time Processes," Management Science, INFORMS, vol. 39(6), pages 728-735, June.
    4. Hans-Jakob Lüthi & Andrés Polyméris, 1985. "Scheduling to Minimize Maximum Workload," Management Science, INFORMS, vol. 31(11), pages 1409-1415, November.
    5. Anantaram Balakrishnan & François Vanderbeck, 1999. "A Tactical Planning Model for Mixed-Model Electronics Assembly Operations," Operations Research, INFORMS, vol. 47(3), pages 395-409, June.
    6. John Miltenburg, 1989. "Level Schedules for Mixed-Model Assembly Lines in Just-In-Time Production Systems," Management Science, INFORMS, vol. 35(2), pages 192-207, February.
    7. Paul J. Schweitzer & Abraham Seidmann, 1991. "Optimizing Processing Rates for Flexible Manufacturing Systems," Management Science, INFORMS, vol. 37(4), pages 454-466, April.
    8. Kamran Moinzadeh & T. D. Klastorin, 1995. "Measuring the Impact of a Delay Buffer on Quality Costs with an Unreliable Production Process," Management Science, INFORMS, vol. 41(3), pages 513-523, March.
    9. Chung-Yee Lee & George L. Vairaktarakis, 1997. "Workforce Planning in Mixed Model Assembly Systems," Operations Research, INFORMS, vol. 45(4), pages 553-567, August.
    10. Decker, Maria, 1993. "Capacity smoothing and sequencing for mixed-model lines," International Journal of Production Economics, Elsevier, vol. 30(1), pages 31-42, July.
    11. .Ilker Baybars, 1986. "A Survey of Exact Algorithms for the Simple Assembly Line Balancing Problem," Management Science, INFORMS, vol. 32(8), pages 909-932, August.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Alexander Biele & Lars Mönch, 2018. "Hybrid approaches to optimize mixed-model assembly lines in low-volume manufacturing," Journal of Heuristics, Springer, vol. 24(1), pages 49-81, February.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Boysen, Nils & Fliedner, Malte & Scholl, Armin, 2009. "Sequencing mixed-model assembly lines: Survey, classification and model critique," European Journal of Operational Research, Elsevier, vol. 192(2), pages 349-373, January.
    2. Drexl, Andreas & Jordan, Carsten, 1994. "Materialflußorientierte Produktionssteuerung bei Variantenfließfertigung," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 362, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    3. Jérémie Gallien & Serguei Netessine & Maher Lahmar & Hakan Ergan & Sergei V. Savin & Michael J. Fry, 2001. "The MSOM Society Student Paper Competition: Extended Abstracts of 2000 Winners," Manufacturing & Service Operations Management, INFORMS, vol. 3(1), pages 1-1.
    4. Matthießen, Lars & Drexl, Andreas & Kimms, Alf, 2000. "Constraint propagation algorithms for the car sequencing problem," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 531, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    5. A Lim & Z Xu, 2009. "Searching optimal resequencing and feature assignment on an automated assembly line," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 60(3), pages 361-371, March.
    6. Ding, Fong-Yuen & Zhu, Jin & Sun, Hui, 2006. "Comparing two weighted approaches for sequencing mixed-model assembly lines with multiple objectives," International Journal of Production Economics, Elsevier, vol. 102(1), pages 108-131, July.
    7. Becker, Christian & Scholl, Armin, 2006. "A survey on problems and methods in generalized assembly line balancing," European Journal of Operational Research, Elsevier, vol. 168(3), pages 694-715, February.
    8. N. Brauner & Y. Crama & A. Grigoriev & J. Klundert, 2005. "A Framework for the Complexity of High-Multiplicity Scheduling Problems," Journal of Combinatorial Optimization, Springer, vol. 9(3), pages 313-323, May.
    9. Bautista, Joaquín & Alfaro, Rocío & Batalla, Cristina, 2015. "Modeling and solving the mixed-model sequencing problem to improve productivity," International Journal of Production Economics, Elsevier, vol. 161(C), pages 83-95.
    10. Ioanna Makarouni & John Psarras & Eleftherios Siskos, 2015. "Interactive bicriterion decision support for a large scale industrial scheduling system," Annals of Operations Research, Springer, vol. 227(1), pages 45-61, April.
    11. Marshall L. Fisher & Christopher D. Ittner, 1999. "The Impact of Product Variety on Automobile Assembly Operations: Empirical Evidence and Simulation Analysis," Management Science, INFORMS, vol. 45(6), pages 771-786, June.
    12. Lovgren, Robin H. & Racer, Michael J., 2000. "Algorithms for mixed-model sequencing with due date restrictions," European Journal of Operational Research, Elsevier, vol. 120(2), pages 408-422, January.
    13. Corominas, Albert & Kubiak, Wieslaw & Pastor, Rafael, 2010. "Mathematical programming modeling of the Response Time Variability Problem," European Journal of Operational Research, Elsevier, vol. 200(2), pages 347-357, January.
    14. Andreas Drexl & Alf Kimms, 2001. "Sequencing JIT Mixed-Model Assembly Lines Under Station-Load and Part-Usage Constraints," Management Science, INFORMS, vol. 47(3), pages 480-491, March.
    15. Xiaobo Zhao & Katsuhisa Ohno & Hon‐Shiang Lau, 2004. "A balancing problem for mixed model assembly lines with a paced moving conveyor," Naval Research Logistics (NRL), John Wiley & Sons, vol. 51(3), pages 446-464, April.
    16. Korkmazel, Tugrul & Meral, Sedef, 2001. "Bicriteria sequencing methods for the mixed-model assembly line in just-in-time production systems," European Journal of Operational Research, Elsevier, vol. 131(1), pages 188-207, May.
    17. Bautista, Joaquin & Companys, Ramon & Corominas, Albert, 2000. "Note on cyclic sequences in the product rate variation problem," European Journal of Operational Research, Elsevier, vol. 124(3), pages 468-477, August.
    18. Steiner, George & Yeomans, Julian Scott, 1996. "Optimal level schedules in mixed-model, multi-level JIT assembly systems with pegging," European Journal of Operational Research, Elsevier, vol. 95(1), pages 38-52, November.
    19. Drexl, Andreas & Kimms, Alf, 1999. "Belastungsorientierte Just-in-Time Variantenfließfertigung," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 502, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    20. Kim, Yeo Keun & Kim, Jae Yun & Kim, Yeongho, 2006. "An endosymbiotic evolutionary algorithm for the integration of balancing and sequencing in mixed-model U-lines," European Journal of Operational Research, Elsevier, vol. 168(3), pages 838-852, February.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:72:y:2001:i:2:p:103-120. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.