IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v56-57y1998i1p649-659.html
   My bibliography  Save this article

Designing scheduling systems for packaging in process industries: A tobacco company case

Author

Listed:
  • Van Dam, Peter
  • Gaalman, Gerard J. C.
  • Sierksma, Gerard

Abstract

No abstract is available for this item.

Suggested Citation

  • Van Dam, Peter & Gaalman, Gerard J. C. & Sierksma, Gerard, 1998. "Designing scheduling systems for packaging in process industries: A tobacco company case," International Journal of Production Economics, Elsevier, vol. 56(1), pages 649-659, September.
  • Handle: RePEc:eee:proeco:v:56-57:y:1998:i:1:p:649-659
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(98)00048-6
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Robert McNaughton, 1959. "Scheduling with Deadlines and Loss Functions," Management Science, INFORMS, vol. 6(1), pages 1-12, October.
    2. Claassen, G. D. H. & van Beek, P., 1993. "Planning and scheduling packaging lines in food industry," European Journal of Operational Research, Elsevier, vol. 70(2), pages 150-158, October.
    3. A. M. Geoffrion & G. W. Graves, 1976. "Scheduling Parallel Production Lines with Changeover Costs: Practical Application of a Quadratic Assignment/ LP Approach," Operations Research, INFORMS, vol. 24(4), pages 595-610, August.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Soman, Chetan Anil & Donk, Dirk Pieter van & Gaalman, Gerard, 2002. "Combined make-to-order and make-to-stock in a food production system," Research Report 02A49, University of Groningen, Research Institute SOM (Systems, Organisations and Management).
    2. repec:dgr:rugsom:02a49 is not listed on IDEAS
    3. Lagodimos, A.G. & Mihiotis, A.N., 2006. "Overtime vs. regular shift planning decisions in packing shops," International Journal of Production Economics, Elsevier, vol. 101(2), pages 246-258, June.
    4. Soman, Chetan Anil & van Donk, Dirk Pieter & Gaalman, Gerard, 2004. "Combined make-to-order and make-to-stock in a food production system," International Journal of Production Economics, Elsevier, vol. 90(2), pages 223-235, July.
    5. Akkerman, Renzo & van Donk, Dirk Pieter, 2007. "Product prioritization in a two-stage food production system with intermediate storage," International Journal of Production Economics, Elsevier, vol. 108(1-2), pages 43-53, July.
    6. Lagodimos, A.G. & Mihiotis, A.N., 2010. "Efficient overtime planning in packing shops with lines of identical manning," International Journal of Production Economics, Elsevier, vol. 124(2), pages 453-462, April.
    7. Dirk Briskorn & Philipp Zeise, 2019. "A cyclic production scheme for the synchronized and integrated two-level lot-sizing and scheduling problem with no-wait restrictions and stochastic demand," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 41(4), pages 895-942, December.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Torki, Abdolhamid & Yajima, Yatsutoshi & Enkawa, Takao, 1996. "A low-rank bilinear programming approach for sub-optimal solution of the quadratic assignment problem," European Journal of Operational Research, Elsevier, vol. 94(2), pages 384-391, October.
    2. Liu Guiqing & Li Kai & Cheng Bayi, 2015. "Preemptive Scheduling with Controllable Processing Times on Parallel Machines," Journal of Systems Science and Information, De Gruyter, vol. 3(1), pages 68-76, February.
    3. Becker, Christian & Scholl, Armin, 2006. "A survey on problems and methods in generalized assembly line balancing," European Journal of Operational Research, Elsevier, vol. 168(3), pages 694-715, February.
    4. Hoogeveen, J. A. & Lenstra, J. K. & Veltman, B., 1996. "Preemptive scheduling in a two-stage multiprocessor flow shop is NP-hard," European Journal of Operational Research, Elsevier, vol. 89(1), pages 172-175, February.
    5. Yung-Chia Chang & Kuei-Hu Chang & Ching-Ping Zheng, 2022. "Application of a Non-Dominated Sorting Genetic Algorithm to Solve a Bi-Objective Scheduling Problem Regarding Printed Circuit Boards," Mathematics, MDPI, vol. 10(13), pages 1-21, July.
    6. Scholl, Armin & Becker, Christian, 2006. "State-of-the-art exact and heuristic solution procedures for simple assembly line balancing," European Journal of Operational Research, Elsevier, vol. 168(3), pages 666-693, February.
    7. Hungerländer, Philipp & Anjos, Miguel F., 2015. "A semidefinite optimization-based approach for global optimization of multi-row facility layout," European Journal of Operational Research, Elsevier, vol. 245(1), pages 46-61.
    8. C N Potts & V A Strusevich, 2009. "Fifty years of scheduling: a survey of milestones," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 60(1), pages 41-68, May.
    9. Herrán, Alberto & Manuel Colmenar, J. & Duarte, Abraham, 2021. "An efficient variable neighborhood search for the Space-Free Multi-Row Facility Layout problem," European Journal of Operational Research, Elsevier, vol. 295(3), pages 893-907.
    10. Leah Epstein, 2023. "Parallel solutions for preemptive makespan scheduling on two identical machines," Journal of Scheduling, Springer, vol. 26(1), pages 61-76, February.
    11. Djellab, Housni & Djellab, Khaled, 2002. "Preemptive Hybrid Flowshop Scheduling problem of interval orders," European Journal of Operational Research, Elsevier, vol. 137(1), pages 37-49, February.
    12. Han, Bin & Zhang, Wenjun & Lu, Xiwen & Lin, Yingzi, 2015. "On-line supply chain scheduling for single-machine and parallel-machine configurations with a single customer: Minimizing the makespan and delivery cost," European Journal of Operational Research, Elsevier, vol. 244(3), pages 704-714.
    13. Huo, Yumei & Zhao, Hairong, 2015. "Total completion time minimization on multiple machines subject to machine availability and makespan constraints," European Journal of Operational Research, Elsevier, vol. 243(2), pages 547-554.
    14. Chen, Lin & Ye, Deshi & Zhang, Guochuan, 2018. "Parallel machine scheduling with speed-up resources," European Journal of Operational Research, Elsevier, vol. 268(1), pages 101-112.
    15. Xu, Jun & Wang, Jun-Qiang & Liu, Zhixin, 2022. "Parallel batch scheduling: Impact of increasing machine capacity," Omega, Elsevier, vol. 108(C).
    16. Zeynep Adak & Mahmure Övül Arıoğlu Akan & Serol Bulkan, 0. "Multiprocessor open shop problem: literature review and future directions," Journal of Combinatorial Optimization, Springer, vol. 0, pages 1-23.
    17. Mehdi Rajabi Asadabadi, 2017. "A developed slope order index (SOI) for bottlenecks in projects and production lines," Computational Management Science, Springer, vol. 14(2), pages 281-291, April.
    18. Jiang, Xiaojuan & Lee, Kangbok & Pinedo, Michael L., 2021. "Ideal schedules in parallel machine settings," European Journal of Operational Research, Elsevier, vol. 290(2), pages 422-434.
    19. Yiwei Jiang & Zewei Weng & Jueliang Hu, 2014. "Algorithms with limited number of preemptions for scheduling on parallel machines," Journal of Combinatorial Optimization, Springer, vol. 27(4), pages 711-723, May.
    20. Shirvani, Nargess & Ruiz, Rubén & Shadrokh, Shahram, 2014. "Cyclic scheduling of perishable products in parallel machine with release dates, due dates and deadlines," International Journal of Production Economics, Elsevier, vol. 156(C), pages 1-12.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:56-57:y:1998:i:1:p:649-659. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.