IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v39y1995i3p201-214.html
   My bibliography  Save this article

Positioning of automated guided vehicles in a loop layout to minimize the mean vehicle response time

Author

Listed:
  • Kim, Kap Hwan

Abstract

No abstract is available for this item.

Suggested Citation

  • Kim, Kap Hwan, 1995. "Positioning of automated guided vehicles in a loop layout to minimize the mean vehicle response time," International Journal of Production Economics, Elsevier, vol. 39(3), pages 201-214, May.
  • Handle: RePEc:eee:proeco:v:39:y:1995:i:3:p:201-214
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/0925-5273(95)00022-G
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Panagiotis Kouvelis & Michael W. Kim, 1992. "Unidirectional Loop Network Layout Problem in Automated Manufacturing Systems," Operations Research, INFORMS, vol. 40(3), pages 533-550, June.
    2. Egbelu, Pius J., 1993. "Positioning of automated guided vehicles in a loop layout to improve response time," European Journal of Operational Research, Elsevier, vol. 71(1), pages 32-44, November.
    3. תמר אליאב ולאה ענבר, 1992. "גמלאות אמהות 1990/91," Working Papers 519, National Insurance Institute of Israel.
    4. דליה גורדון ותמר אליאב, 1992. "משפחות חד הוריות, 1991," Working Papers 539, National Insurance Institute of Israel.
    5. Co, Christine G. & Tanchoco, J. M. A., 1991. "A review of research on AGVS vehicle management," Engineering Costs and Production Economics, Elsevier, vol. 21(1), pages 35-42, February.
    6. אסתר טולידנו, 1992. "מקבלי דמי אבטלה בשנת 1991," Working Papers 563, National Insurance Institute of Israel.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Gademann, A. J. R. M. & van de Velde, S. L., 2000. "Positioning automated guided vehicles in a loop layout," European Journal of Operational Research, Elsevier, vol. 127(3), pages 565-573, December.
    2. Le-Anh, Tuan & De Koster, M.B.M., 2006. "A review of design and control of automated guided vehicle systems," European Journal of Operational Research, Elsevier, vol. 171(1), pages 1-23, May.
    3. Le-Anh, T. & de Koster, M.B.M., 2004. "A Review Of Design And Control Of Automated Guided Vehicle Systems," ERIM Report Series Research in Management ERS;2004-030-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
    4. Ferrara, Andrea & Gebennini, Elisa & Grassi, Andrea, 2014. "Fleet sizing of laser guided vehicles and pallet shuttles in automated warehouses," International Journal of Production Economics, Elsevier, vol. 157(C), pages 7-14.
    5. Ventura, José A. & Rieksts, Brian Q., 2009. "Optimal location of dwell points in a single loop AGV system with time restrictions on vehicle availability," European Journal of Operational Research, Elsevier, vol. 192(1), pages 93-104, January.
    6. Asef-Vaziri, Ardavan & Laporte, Gilbert, 2005. "Loop based facility planning and material handling," European Journal of Operational Research, Elsevier, vol. 164(1), pages 1-11, July.
    7. Ventura, José A. & Pazhani, Subramanian & Mendoza, Abraham, 2015. "Finding optimal dwell points for automated guided vehicles in general guide-path layouts," International Journal of Production Economics, Elsevier, vol. 170(PC), pages 850-861.
    8. Vis, Iris F.A., 2006. "Survey of research in the design and control of automated guided vehicle systems," European Journal of Operational Research, Elsevier, vol. 170(3), pages 677-709, May.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Bazsa, E. M. & Frenk, J. B. G. & den Iseger, P. W., 2001. "Modeling of inventory control with regenerative processes," International Journal of Production Economics, Elsevier, vol. 71(1-3), pages 263-276, May.
    2. Anjomani, Ardeshir, 2002. "Regional growth and interstate migration," Socio-Economic Planning Sciences, Elsevier, vol. 36(4), pages 239-265, December.
    3. Kalu, Timothy Ch. U., 1999. "Capital budgeting under uncertainty: An extended goal programming approach," International Journal of Production Economics, Elsevier, vol. 58(3), pages 235-251, January.
    4. Motwani, Jaideep & Mirchandani, Dinesh & Madan, Manu & Gunasekaran, A., 2002. "Successful implementation of ERP projects: Evidence from two case studies," International Journal of Production Economics, Elsevier, vol. 75(1-2), pages 83-96, January.
    5. Ginn, Martin E., 1998. "Underpinning professional career development through a systems analysis methodology," Socio-Economic Planning Sciences, Elsevier, vol. 32(1), pages 67-81, March.
    6. Vis, Iris F.A., 2006. "Survey of research in the design and control of automated guided vehicle systems," European Journal of Operational Research, Elsevier, vol. 170(3), pages 677-709, May.
    7. Gonzalez-Benito, Javier & Suarez-Gonzalez, Isabel & Spring, Martin, 2000. "Complementarities between JIT purchasing practices: An economic analysis based on transaction costs," International Journal of Production Economics, Elsevier, vol. 67(3), pages 279-293, October.
    8. Bal, F. & Button, K. J. & Nijkamp, P., 2002. "Ceteris paribus, meta-analysis and value transfer," Socio-Economic Planning Sciences, Elsevier, vol. 36(2), pages 127-138, June.
    9. Albino, Vito & Izzo, Carmen & Kuhtz, Silvana, 2002. "Input-output models for the analysis of a local/global supply chain," International Journal of Production Economics, Elsevier, vol. 78(2), pages 119-131, July.
    10. Ekins, Paul & Simon, Sandrine, 2003. "An illustrative application of the CRITINC framework to the UK," Ecological Economics, Elsevier, vol. 44(2-3), pages 255-275, March.
    11. Andersson, Jonas & Melchiors, Philip, 2001. "A two-echelon inventory model with lost sales," International Journal of Production Economics, Elsevier, vol. 69(3), pages 307-315, February.
    12. Shibuya, Takeshi & Dohi, Tadashi & Osaki, Shunji, 1998. "Optimal continuous review policies for spare part provisioning with random lead times," International Journal of Production Economics, Elsevier, vol. 55(3), pages 257-271, August.
    13. Metcalfe, Beverly, 1997. "Project management system design: A social and organisational analysis," International Journal of Production Economics, Elsevier, vol. 52(3), pages 305-316, October.
    14. Maffin, David & Braiden, Paul, 2001. "Manufacturing and supplier roles in product development," International Journal of Production Economics, Elsevier, vol. 69(2), pages 205-213, January.
    15. Ertugrul Karsak, E. & Tolga, Ethem, 2001. "Fuzzy multi-criteria decision-making procedure for evaluating advanced manufacturing system investments," International Journal of Production Economics, Elsevier, vol. 69(1), pages 49-64, January.
    16. Forza, C. & Salvador, F., 2001. "Information flows for high-performance manufacturing," International Journal of Production Economics, Elsevier, vol. 70(1), pages 21-36, March.
    17. Bell, Michelle L. & Hobbs, Benjamin F. & Ellis, Hugh, 2003. "The use of multi-criteria decision-making methods in the integrated assessment of climate change: implications for IA practitioners," Socio-Economic Planning Sciences, Elsevier, vol. 37(4), pages 289-316, December.
    18. Witzerman, James P. & Nof, Shimon Y., 1995. "Tool integration for collaborative design of manufacturing cells," International Journal of Production Economics, Elsevier, vol. 38(1), pages 23-30, March.
    19. van den Berg, Jeroen P., 2002. "Analytic expressions for the optimal dwell point in an automated storage/retrieval system," International Journal of Production Economics, Elsevier, vol. 76(1), pages 13-25, March.
    20. Giannoccaro, Ilaria & Pontrandolfo, Pierpaolo, 2002. "Inventory management in supply chains: a reinforcement learning approach," International Journal of Production Economics, Elsevier, vol. 78(2), pages 153-161, July.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:39:y:1995:i:3:p:201-214. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.