IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v104y2006i2p427-440.html
   My bibliography  Save this article

The effect of updating lead times on the performance of hierarchical planning systems

Author

Listed:
  • Selcuk, B.
  • Fransoo, J.C.
  • De Kok, A.G.

Abstract

No abstract is available for this item.

Suggested Citation

  • Selcuk, B. & Fransoo, J.C. & De Kok, A.G., 2006. "The effect of updating lead times on the performance of hierarchical planning systems," International Journal of Production Economics, Elsevier, vol. 104(2), pages 427-440, December.
  • Handle: RePEc:eee:proeco:v:104:y:2006:i:2:p:427-440
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(05)00149-0
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Peter J. Billington & John O. McClain & L. Joseph Thomas, 1983. "Mathematical Programming Approaches to Capacity-Constrained MRP Systems: Review, Formulation and Problem Reduction," Management Science, INFORMS, vol. 29(10), pages 1126-1141, October.
    2. M. A. H. Dempster & M. L. Fisher & L. Jansen & B. J. Lageweg & J. K. Lenstra & A. H. G. Rinnooy Kan, 1981. "Analytical Evaluation of Hierarchical Planning Systems," Operations Research, INFORMS, vol. 29(4), pages 707-716, August.
    3. Axsater, Sven & Jonsson, Henrik, 1984. "Aggregation and disaggregation in hierarchical production planning," European Journal of Operational Research, Elsevier, vol. 17(3), pages 338-350, September.
    4. Stephen C. Graves, 1982. "Using Lagrangean Techniques to Solve Hierarchical Production Planning Problems," Management Science, INFORMS, vol. 28(3), pages 260-275, March.
    5. Schneewei[beta], Christoph, 1995. "Hierarchical structures in organisations: A conceptual framework," European Journal of Operational Research, Elsevier, vol. 86(1), pages 4-31, October.
    6. Uday S. Karmarkar, 1987. "Lot Sizes, Lead Times and In-Process Inventories," Management Science, INFORMS, vol. 33(3), pages 409-418, March.
    7. Zijm, W. H. M. & Buitenhek, R., 1996. "Capacity planning and lead time management," International Journal of Production Economics, Elsevier, vol. 46(1), pages 165-179, December.
    8. Chung, Chen-Hua & Krajewski, Lee J, 1987. "Interfacing aggregate plans and master production schedules via a rolling horizon feedback procedure," Omega, Elsevier, vol. 15(5), pages 401-409.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Gahm, Christian & Uzunoglu, Aykut & Wahl, Stefan & Ganschinietz, Chantal & Tuma, Axel, 2022. "Applying machine learning for the anticipation of complex nesting solutions in hierarchical production planning," European Journal of Operational Research, Elsevier, vol. 296(3), pages 819-836.
    2. Haeussler, Stefan & Stefan, Matthias & Schneckenreither, Manuel & Onay, Anita, 2021. "The lead time updating trap: Analyzing human behavior in capacitated supply chains," International Journal of Production Economics, Elsevier, vol. 234(C).
    3. Jalali, Hamed & Carmen, Raïsa & Van Nieuwenhuyse, Inneke & Boute, Robert, 2019. "Quality and pricing decisions in production/inventory systems," European Journal of Operational Research, Elsevier, vol. 272(1), pages 195-206.
    4. Tom Vogel & Bernardo Almada-Lobo & Christian Almeder, 2017. "Integrated versus hierarchical approach to aggregate production planning and master production scheduling," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 39(1), pages 193-229, January.
    5. Warburton, Roger D.H. & Hodgson, J.P.E. & Nielsen, E.H., 2014. "Exact solutions to the supply chain equations for arbitrary, time-dependent demands," International Journal of Production Economics, Elsevier, vol. 151(C), pages 195-205.
    6. Julia Pahl & Stefan Voß & David Woodruff, 2007. "Production planning with load dependent lead times: an update of research," Annals of Operations Research, Springer, vol. 153(1), pages 297-345, September.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Julia Pahl & Stefan Voß & David Woodruff, 2007. "Production planning with load dependent lead times: an update of research," Annals of Operations Research, Springer, vol. 153(1), pages 297-345, September.
    2. Huang, Hai-Jun & Xu, Gang, 1998. "Aggregate scheduling and network solving of multi-stage and multi-item manufacturing systems," European Journal of Operational Research, Elsevier, vol. 105(1), pages 52-65, February.
    3. Xue, Guisen & Felix Offodile, O. & Zhou, Hong & Troutt, Marvin D., 2011. "Integrated production planning with sequence-dependent family setup times," International Journal of Production Economics, Elsevier, vol. 131(2), pages 674-681, June.
    4. Fumero, Francesca & Vercellis, Carlo, 1997. "Integrating distribution, machine assignment and lot-sizing via Lagrangean relaxation," International Journal of Production Economics, Elsevier, vol. 49(1), pages 45-54, March.
    5. Jans, R.F. & Degraeve, Z., 2005. "Modeling Industrial Lot Sizing Problems: A Review," ERIM Report Series Research in Management ERS-2005-049-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
    6. Samaddar, Subhashish & Rabinowitz, Gad & Zhang, Guoqiang Peter, 2005. "An experimental analysis of solution performance in a resource sharing and scheduling problem," European Journal of Operational Research, Elsevier, vol. 165(1), pages 139-156, August.
    7. Marc R. Lambrecht & Philip L. Ivens & Nico J. Vandaele, 1998. "ACLIPS: A Capacity and Lead Time Integrated Procedure for Scheduling," Management Science, INFORMS, vol. 44(11-Part-1), pages 1548-1561, November.
    8. Kim, Bokang & Kim, Sooyoung, 2001. "Extended model for a hybrid production planning approach," International Journal of Production Economics, Elsevier, vol. 73(2), pages 165-173, September.
    9. Ozdamar, Linet & Bozyel, M. Ali & Birbil, S. Ilker, 1998. "A hierarchical decision support system for production planning (with case study)," European Journal of Operational Research, Elsevier, vol. 104(3), pages 403-422, February.
    10. Sampath Rajagopalan & Jayashankar M. Swaminathan, 2001. "A Coordinated Production Planning Model with Capacity Expansion and Inventory Management," Management Science, INFORMS, vol. 47(11), pages 1562-1580, November.
    11. Segerstedt, Anders, 1996. "A capacity-constrained multi-level inventory and production control problem," International Journal of Production Economics, Elsevier, vol. 45(1-3), pages 449-461, August.
    12. Tom Vogel & Bernardo Almada-Lobo & Christian Almeder, 2017. "Integrated versus hierarchical approach to aggregate production planning and master production scheduling," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 39(1), pages 193-229, January.
    13. Shapiro, Jeremy F., 1939-, 1998. "Bottom-up vs. top-down approaches to supply chain management and modeling," Working papers WP 4017-98., Massachusetts Institute of Technology (MIT), Sloan School of Management.
    14. Subba Rao, S. & Gunasekaran, A. & Goyal, S. K. & Martikainen, T., 1998. "Waiting line model applications in manufacturing," International Journal of Production Economics, Elsevier, vol. 54(1), pages 1-28, January.
    15. Peiling Wu & Joseph C. Hartman & George R. Wilson, 2005. "An Integrated Model and Solution Approach for Fleet Sizing with Heterogeneous Assets," Transportation Science, INFORMS, vol. 39(1), pages 87-103, February.
    16. Shah, Purvi, 2020. "Managing customer reactions to brand deletion in B2B and B2C contexts," Journal of Retailing and Consumer Services, Elsevier, vol. 57(C).
    17. Lee, L. H. & Chew, E. P. & Ng, T. S., 2005. "Production planning with approved vendor matrices for a hard-disk drive manufacturer," European Journal of Operational Research, Elsevier, vol. 162(2), pages 310-324, April.
    18. Jalali, Hamed & Carmen, Raïsa & Van Nieuwenhuyse, Inneke & Boute, Robert, 2019. "Quality and pricing decisions in production/inventory systems," European Journal of Operational Research, Elsevier, vol. 272(1), pages 195-206.
    19. Tao Wu & Leyuan Shi & Joseph Geunes & Kerem Akartunalı, 2012. "On the equivalence of strong formulations for capacitated multi-level lot sizing problems with setup times," Journal of Global Optimization, Springer, vol. 53(4), pages 615-639, August.
    20. Awi Federgruen & Joern Meissner & Michal Tzur, 2007. "Progressive Interval Heuristics for Multi-Item Capacitated Lot-Sizing Problems," Operations Research, INFORMS, vol. 55(3), pages 490-502, June.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:104:y:2006:i:2:p:427-440. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.