Advanced Search
MyIDEAS: Login

Forward reliability markets: Less risk, less market power, more efficiency

Contents:

Author Info

  • Cramton, Peter
  • Stoft, Steven

Abstract

A forward reliability market is presented. The market coordinates new entry through the forward procurement of reliability options--physical capacity bundled with a financial option to supply energy above a strike price. The market assures adequate generating resources and prices capacity from the bids of competitive new entry in an annual auction. Efficient performance incentives are maintained from a load-following obligation to supply energy above the strike price. The capacity payment fully hedges load from high spot prices, and reduces supplier risk as well. Market power is reduced in the spot market, since suppliers enter the spot market with a nearly balanced position in times of scarcity. Market power in the reliability market is addressed by not allowing existing supply to impact the capacity price. The approach, which has been adopted in New England and Colombia, is readily adapted to either a thermal system or a hydro system.

Download Info

If you experience problems downloading a file, check if you have the proper application to view it first. In case of further problems read the IDEAS help page. Note that these files are not on the IDEAS site. Please be patient as the files may be large.
File URL: http://www.sciencedirect.com/science/article/B6VFT-4S3P85R-1/1/c5f35f0d9ce5ec2a4045b297e06d4dde
Download Restriction: Full text for ScienceDirect subscribers only

As the access to this document is restricted, you may want to look for a different version under "Related research" (further below) or search for a different version of it.

Bibliographic Info

Article provided by Elsevier in its journal Utilities Policy.

Volume (Year): 16 (2008)
Issue (Month): 3 (September)
Pages: 194-201

as in new window
Handle: RePEc:eee:juipol:v:16:y:2008:i:3:p:194-201

Contact details of provider:
Web page: http://www.elsevier.com/locate/inca/30478

Related research

Keywords:

Other versions of this item:

Find related papers by JEL classification:

References

References listed on IDEAS
Please report citation or reference errors to , or , if you are the registered author of the cited work, log in to your RePEc Author Service profile, click on "citations" and make appropriate adjustments.:
as in new window
  1. Peter Cramton & Steven Stoft & Jeffrey West, 2006. "Simulation of the Colombian Firm Energy Market," Papers of Peter Cramton 06scfem, University of Maryland, Department of Economics - Peter Cramton, revised 2006.
  2. Peter Cramton & Steven Stoft, 2007. "Colombia Firm Energy Market," Papers of Peter Cramton 07cfem, University of Maryland, Department of Economics - Peter Cramton, revised 2007.
  3. Peter Cramton & Steven Stoft, 2006. "The Convergence of Market Designs for Adequate Generating Capacity," Papers of Peter Cramton 06mdfra, University of Maryland, Department of Economics - Peter Cramton, revised 2006.
Full references (including those not matched with items on IDEAS)

Citations

Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
as in new window

Cited by:
  1. Léautier, Thomas-Olivier, 2011. "The Visible Hand: Ensuring Optimal Investment in Electric Power Generation," TSE Working Papers 10-153, Toulouse School of Economics (TSE), revised 19 Aug 2012.
  2. Nicolosi, Marco, 2010. "Wind power integration and power system flexibility-An empirical analysis of extreme events in Germany under the new negative price regime," Energy Policy, Elsevier, vol. 38(11), pages 7257-7268, November.
  3. Ausubel, Lawrence M. & Cramton, Peter, 2010. "Using forward markets to improve electricity market design," Utilities Policy, Elsevier, vol. 18(4), pages 195-200, December.
  4. Peter Cramton, 2009. "Innovation and Market Design," Papers of Peter Cramton 09imd, University of Maryland, Department of Economics - Peter Cramton, revised 2009.
  5. Green, Richard, 2010. "Are the British electricity trading and transmission arrangements future-proof?," Utilities Policy, Elsevier, vol. 18(4), pages 186-194, December.
  6. Frederic Murphy & Yves Smeers, 2012. "Withholding investments in energy only markets: can contracts make a difference?," Journal of Regulatory Economics, Springer, vol. 42(2), pages 159-179, October.
  7. de Vries, Laurens & Heijnen, Petra, 2008. "The impact of electricity market design upon investment under uncertainty: The effectiveness of capacity mechanisms," Utilities Policy, Elsevier, vol. 16(3), pages 215-227, September.
  8. Finon, Dominique & Pignon, Virginie, 2008. "Electricity and long-term capacity adequacy: The quest for regulatory mechanism compatible with electricity market," Utilities Policy, Elsevier, vol. 16(3), pages 143-158, September.
  9. Arango, Santiago & Larsen, Erik, 2011. "Cycles in deregulated electricity markets: Empirical evidence from two decades," Energy Policy, Elsevier, vol. 39(5), pages 2457-2466, May.
  10. Elberg, Christina & Kranz, Sebastian, 2013. "Capacity Mechanisms and Effects on Market Structure," Annual Conference 2013 (Duesseldorf): Competition Policy and Regulation in a Global Economic Order 79811, Verein für Socialpolitik / German Economic Association.
  11. Nagl, Stephan, 2013. "The Effect of Weather Uncertainty on the Financial Risk of Green Electricity Producers under Various Renewable Policies," EWI Working Papers 2013-15, Energiewirtschaftliches Institut an der Universitaet zu Koeln.
  12. Bolton, Gary E. & Ockenfels, Axel, 2012. "Behavioral economic engineering," Journal of Economic Psychology, Elsevier, vol. 33(3), pages 665-676.
  13. Nicolosi, S., 2010. "Wind power integration, negative prices and power system flexibility - An empirical analysis of extreme events in Germany," MPRA Paper 31834, University Library of Munich, Germany.

Lists

This item is not listed on Wikipedia, on a reading list or among the top items on IDEAS.

Statistics

Access and download statistics

Corrections

When requesting a correction, please mention this item's handle: RePEc:eee:juipol:v:16:y:2008:i:3:p:194-201. See general information about how to correct material in RePEc.

For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: (Zhang, Lei).

If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

If references are entirely missing, you can add them using this form.

If the full references list an item that is present in RePEc, but the system did not link to it, you can help with this form.

If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your profile, as there may be some citations waiting for confirmation.

Please note that corrections may take a couple of weeks to filter through the various RePEc services.