IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v233y2014i2p408-419.html
   My bibliography  Save this article

A multi-criteria decision making model for advanced repair-to-order and disassembly-to-order system

Author

Listed:
  • Ondemir, Onder
  • Gupta, Surendra M.

Abstract

Sensor-embedded products (SEPs) eliminate a majority of uncertainties involved in product recovery by providing item-based life-cycle information. This information includes the content of each product and component conditions, and enables the estimation of remaining useful life of the components. Once the data on the products are captured, it is possible to make optimal recovery decisions without any preliminary disassembly or inspection operations.

Suggested Citation

  • Ondemir, Onder & Gupta, Surendra M., 2014. "A multi-criteria decision making model for advanced repair-to-order and disassembly-to-order system," European Journal of Operational Research, Elsevier, vol. 233(2), pages 408-419.
  • Handle: RePEc:eee:ejores:v:233:y:2014:i:2:p:408-419
    DOI: 10.1016/j.ejor.2013.09.003
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S037722171300739X
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ejor.2013.09.003?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Herzog, M.A. & Marwala, T. & Heyns, P.S., 2009. "Machine and component residual life estimation through the application of neural networks," Reliability Engineering and System Safety, Elsevier, vol. 94(2), pages 479-489.
    2. Barba-Gutierrez, Y. & Adenso-Diaz, B. & Gupta, S.M., 2008. "Lot sizing in reverse MRP for scheduling disassembly," International Journal of Production Economics, Elsevier, vol. 111(2), pages 741-751, February.
    3. Georgiadis, Patroklos & Athanasiou, Efstratios, 2013. "Flexible long-term capacity planning in closed-loop supply chains with remanufacturing," European Journal of Operational Research, Elsevier, vol. 225(1), pages 44-58.
    4. Salema, Maria Isabel Gomes & Barbosa-Povoa, Ana Paula & Novais, Augusto Q., 2007. "An optimization model for the design of a capacitated multi-product reverse logistics network with uncertainty," European Journal of Operational Research, Elsevier, vol. 179(3), pages 1063-1077, June.
    5. Ferrer, Geraldo, 2003. "Yield information and supplier responsiveness in remanufacturing operations," European Journal of Operational Research, Elsevier, vol. 149(3), pages 540-556, September.
    6. Si, Xiao-Sheng & Wang, Wenbin & Hu, Chang-Hua & Zhou, Dong-Hua, 2011. "Remaining useful life estimation - A review on the statistical data driven approaches," European Journal of Operational Research, Elsevier, vol. 213(1), pages 1-14, August.
    7. Fleischmann, Moritz & Bloemhof-Ruwaard, Jacqueline M. & Dekker, Rommert & van der Laan, Erwin & van Nunen, Jo A. E. E. & Van Wassenhove, Luk N., 1997. "Quantitative models for reverse logistics: A review," European Journal of Operational Research, Elsevier, vol. 103(1), pages 1-17, November.
    8. anonymous, 2009. "Editorial Statements," Management Science, INFORMS, vol. 55(1), pages 1-1, January.
    9. Kongar, Elif & Gupta, Surendra M., 2006. "Disassembly to order system under uncertainty," Omega, Elsevier, vol. 34(6), pages 550-561, December.
    10. Moore, Kendra E. & Gungor, Askiner & Gupta, Surendra M., 2001. "Petri net approach to disassembly process planning for products with complex AND/OR precedence relationships," European Journal of Operational Research, Elsevier, vol. 135(2), pages 428-449, December.
    11. Eric Cornuel & H. Thomas, 2009. "Guest editorial," Post-Print hal-00493165, HAL.
    12. Schultmann, Frank & Zumkeller, Moritz & Rentz, Otto, 2006. "Modeling reverse logistic tasks within closed-loop supply chains: An example from the automotive industry," European Journal of Operational Research, Elsevier, vol. 171(3), pages 1033-1050, June.
    13. Elif Kongar & Surendra M. Gupta, 2009. "Solving the disassembly-to-order problem using linear physical programming," International Journal of Mathematics in Operational Research, Inderscience Enterprises Ltd, vol. 1(4), pages 504-531.
    14. Ketzenberg, Michael, 2009. "The value of information in a capacitated closed loop supply chain," European Journal of Operational Research, Elsevier, vol. 198(2), pages 491-503, October.
    15. McGovern, Seamus M. & Gupta, Surendra M., 2007. "A balancing method and genetic algorithm for disassembly line balancing," European Journal of Operational Research, Elsevier, vol. 179(3), pages 692-708, June.
    16. Ngai, E.W.T. & Moon, Karen K.L. & Riggins, Frederick J. & Yi, Candace Y., 2008. "RFID research: An academic literature review (1995-2005) and future research directions," International Journal of Production Economics, Elsevier, vol. 112(2), pages 510-520, April.
    17. Georgiadis, Patroklos & Athanasiou, Efstratios, 2010. "The impact of two-product joint lifecycles on capacity planning of remanufacturing networks," European Journal of Operational Research, Elsevier, vol. 202(2), pages 420-433, April.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Ahmed Musa & Al-Amin Abba Dabo, 2016. "A Review of RFID in Supply Chain Management: 2000–2015," Global Journal of Flexible Systems Management, Springer;Global Institute of Flexible Systems Management, vol. 17(2), pages 189-228, June.
    2. Muris Lage Junior & Moacir Godinho Filho, 2017. "Master disassembly scheduling in a remanufacturing system with stochastic routings," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 25(1), pages 123-138, March.
    3. Patricia Guarnieri & Lucio Camara e Silva & Bárbara de Oliveira Vieira, 2020. "How to Assess Reverse Logistics of e-Waste Considering a Multicriteria Perspective? A Model Proposition," Logistics, MDPI, vol. 4(4), pages 1-31, October.
    4. Ren, Yaping & Zhang, Chaoyong & Zhao, Fu & Xiao, Huajun & Tian, Guangdong, 2018. "An asynchronous parallel disassembly planning based on genetic algorithm," European Journal of Operational Research, Elsevier, vol. 269(2), pages 647-660.
    5. Mehmet Talha Dulman & Surendra M. Gupta, 2018. "Evaluation of Maintenance and EOL Operation Performance of Sensor-Embedded Laptops," Logistics, MDPI, vol. 2(1), pages 1-22, January.
    6. Özden Tozanlı & Elif Kongar & Surendra M. Gupta, 2020. "Evaluation of Waste Electronic Product Trade-in Strategies in Predictive Twin Disassembly Systems in the Era of Blockchain," Sustainability, MDPI, vol. 12(13), pages 1-33, July.
    7. Meng, Kai & Cao, Ying & Peng, Xianghui & Prybutok, Victor & Gupta, Varun, 2020. "Demand-dependent recovery decision-making of a batch of products for sustainability," International Journal of Production Economics, Elsevier, vol. 224(C).
    8. Dejian Yu, 2016. "Softmax function based intuitionistic fuzzy multi-criteria decision making and applications," Operational Research, Springer, vol. 16(2), pages 327-348, July.
    9. Meng, Kai & Lou, Peihuang & Peng, Xianghui & Prybutok, Victor, 2017. "Multi-objective optimization decision-making of quality dependent product recovery for sustainability," International Journal of Production Economics, Elsevier, vol. 188(C), pages 72-85.
    10. Yicong Gao & Shanhe Lou & Hao Zheng & Jianrong Tan, 2023. "A data-driven method of selective disassembly planning at end-of-life under uncertainty," Journal of Intelligent Manufacturing, Springer, vol. 34(2), pages 565-585, February.
    11. Liu, Kanglin & Zhang, Zhi-Hai, 2018. "Capacitated disassembly scheduling under stochastic yield and demand," European Journal of Operational Research, Elsevier, vol. 269(1), pages 244-257.
    12. Joshi, Aditi D. & Gupta, Surendra M., 2019. "Evaluation of design alternatives of End-Of-Life products using internet of things," International Journal of Production Economics, Elsevier, vol. 208(C), pages 281-293.
    13. Liu, Bingsheng & Shen, Yinghua & Zhang, Wei & Chen, Xiaohong & Wang, Xueqing, 2015. "An interval-valued intuitionistic fuzzy principal component analysis model-based method for complex multi-attribute large-group decision-making," European Journal of Operational Research, Elsevier, vol. 245(1), pages 209-225.
    14. Kai Meng & Peihuang Lou & Xianghui Peng & Victor Prybutok, 2017. "Quality-driven recovery decisions for used components in reverse logistics," International Journal of Production Research, Taylor & Francis Journals, vol. 55(16), pages 4712-4728, August.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Felix T.S. Chan & Nan Li & S.H. Chung & Mozafar Saadat, 2017. "Management of sustainable manufacturing systems-a review on mathematical problems," International Journal of Production Research, Taylor & Francis Journals, vol. 55(4), pages 1210-1225, February.
    2. Mota, Bruna & Gomes, Maria Isabel & Carvalho, Ana & Barbosa-Povoa, Ana Paula, 2018. "Sustainable supply chains: An integrated modeling approach under uncertainty," Omega, Elsevier, vol. 77(C), pages 32-57.
    3. Diabat, Ali & Kannan, Devika & Kaliyan, Mathiyazhagan & Svetinovic, Davor, 2013. "An optimization model for product returns using genetic algorithms and artificial immune system," Resources, Conservation & Recycling, Elsevier, vol. 74(C), pages 156-169.
    4. Pokharel, Shaligram & Mutha, Akshay, 2009. "Perspectives in reverse logistics: A review," Resources, Conservation & Recycling, Elsevier, vol. 53(4), pages 175-182.
    5. Ammar Y. Alqahtani & Surendra M. Gupta, 2017. "One-Dimensional Renewable Warranty Management within Sustainable Supply Chain," Resources, MDPI, vol. 6(2), pages 1-26, April.
    6. Govindan, Kannan & Soleimani, Hamed & Kannan, Devika, 2015. "Reverse logistics and closed-loop supply chain: A comprehensive review to explore the future," European Journal of Operational Research, Elsevier, vol. 240(3), pages 603-626.
    7. Zhang, Abraham & Wang, Jason X. & Farooque, Muhammad & Wang, Yulan & Choi, Tsan-Ming, 2021. "Multi-dimensional circular supply chain management: A comparative review of the state-of-the-art practices and research," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 155(C).
    8. Mehmet Talha Dulman & Surendra M. Gupta, 2018. "Evaluation of Maintenance and EOL Operation Performance of Sensor-Embedded Laptops," Logistics, MDPI, vol. 2(1), pages 1-22, January.
    9. S. Maryam Masoumi & Nima Kazemi & Salwa Hanim Abdul-Rashid, 2019. "Sustainable Supply Chain Management in the Automotive Industry: A Process-Oriented Review," Sustainability, MDPI, vol. 11(14), pages 1-30, July.
    10. De Rosa, Vincenzo & Gebhard, Marina & Hartmann, Evi & Wollenweber, Jens, 2013. "Robust sustainable bi-directional logistics network design under uncertainty," International Journal of Production Economics, Elsevier, vol. 145(1), pages 184-198.
    11. Muris Lage Junior & Moacir Godinho Filho, 2017. "Master disassembly scheduling in a remanufacturing system with stochastic routings," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 25(1), pages 123-138, March.
    12. Majdi Argoubi & Haifa Jammeli & Hatem Masri, 2020. "The intellectual structure of the waste management field," Annals of Operations Research, Springer, vol. 294(1), pages 655-676, November.
    13. Vidovic, Milorad & Dimitrijevic, Branka & Ratkovic, Branislava & Simic, Vladimir, 2011. "A novel covering approach to positioning ELV collection points," Resources, Conservation & Recycling, Elsevier, vol. 57(C), pages 1-9.
    14. Federico Cosenz & Guido Noto, 2016. "Applying System Dynamics Modelling to Strategic Management: A Literature Review," Systems Research and Behavioral Science, Wiley Blackwell, vol. 33(6), pages 703-741, November.
    15. Liu, Kanglin & Zhang, Zhi-Hai, 2018. "Capacitated disassembly scheduling under stochastic yield and demand," European Journal of Operational Research, Elsevier, vol. 269(1), pages 244-257.
    16. He, Yuanjie, 2015. "Acquisition pricing and remanufacturing decisions in a closed-loop supply chain," International Journal of Production Economics, Elsevier, vol. 163(C), pages 48-60.
    17. Gołębiewski, Bronisław & Trajer, Jędrzej & Jaros, Małgorzata & Winiczenko, Radosław, 2013. "Modelling of the location of vehicle recycling facilities: A case study in Poland," Resources, Conservation & Recycling, Elsevier, vol. 80(C), pages 10-20.
    18. Ilgin, Mehmet Ali & Gupta, Surendra M., 2011. "Performance improvement potential of sensor embedded products in environmental supply chains," Resources, Conservation & Recycling, Elsevier, vol. 55(6), pages 580-592.
    19. Barker, Theresa J. & Zabinsky, Zelda B., 2011. "A multicriteria decision making model for reverse logistics using analytical hierarchy process," Omega, Elsevier, vol. 39(5), pages 558-573, October.
    20. Yan, Wei & Xiong, Yu & Xiong, Zhongkai & Guo, Nian, 2015. "Bricks vs. clicks: Which is better for marketing remanufactured products?," European Journal of Operational Research, Elsevier, vol. 242(2), pages 434-444.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:233:y:2014:i:2:p:408-419. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.