IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v203y2010i3p784-785.html
   My bibliography  Save this article

A note on "A mixed integer programming model for advanced planning and scheduling (APS)"

Author

Listed:
  • Örnek, Arslan
  • Özpeynirci, Selin
  • Öztürk, Cemalettin

Abstract

In a recent paper, Chen and Ji [Chen, K., Ji, P., 2007. A mixed integer programming model for advanced planning and scheduling (APS). European Journal of Operational Research 181, 515-522] develop a mixed integer programming model for advanced planning and scheduling problem that considers capacity constraints and precedence relations between the operations. The orders require processing of several operations on eligible machines. The model presented in the above paper works for the case where each operation can be processed on only one machine. However, machine eligibility means that only a subset of machines are capable of processing a job and this subset may include more than one machine. We provide a general model for advanced planning and scheduling problems with machine eligibility. Our model can be used for problems where there are alternative machines that an operation can be assigned to.

Suggested Citation

  • Örnek, Arslan & Özpeynirci, Selin & Öztürk, Cemalettin, 2010. "A note on "A mixed integer programming model for advanced planning and scheduling (APS)"," European Journal of Operational Research, Elsevier, vol. 203(3), pages 784-785, June.
  • Handle: RePEc:eee:ejores:v:203:y:2010:i:3:p:784-785
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377-2217(09)00640-7
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Liao, Ching-Jong & Chao, Chien-Wen & Lin, Chien-Hung, 2009. "Minimizing the sum of job completion times on capacitated two-parallel machines," European Journal of Operational Research, Elsevier, vol. 197(2), pages 475-481, September.
    2. Sawik, Tadeusz, 2004. "Loading and scheduling of a flexible assembly system by mixed integer programming," European Journal of Operational Research, Elsevier, vol. 154(1), pages 1-19, April.
    3. Chen, Kejia & Ji, Ping, 2007. "A mixed integer programming model for advanced planning and scheduling (APS)," European Journal of Operational Research, Elsevier, vol. 181(1), pages 515-522, August.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Wang, Xiuli & Cheng, T.C.E., 2015. "A heuristic for scheduling jobs on two identical parallel machines with a machine availability constraint," International Journal of Production Economics, Elsevier, vol. 161(C), pages 74-82.
    2. Seokcheol Chang & Jaewoo Chung, 2013. "Optimization Models for Production Planning in LG Display," Interfaces, INFORMS, vol. 43(6), pages 518-529, December.
    3. Wang, Haibing & Zheng, Tianhang & Sun, Weiqing & Khan, Muhammad Qasim, 2023. "Research on the pricing strategy of park electric vehicle agent considering carbon trading," Applied Energy, Elsevier, vol. 340(C).
    4. Kristianto, Yohanes & Helo, Petri, 2014. "Product architecture modularity implications for operations economy of green supply chains," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 70(C), pages 128-145.
    5. Tan, Zhiyi & Chen, Yong & Zhang, An, 2011. "Parallel machines scheduling with machine maintenance for minsum criteria," European Journal of Operational Research, Elsevier, vol. 212(2), pages 287-292, July.
    6. Kristianto, Yohanes & Helo, Petri, 2015. "Reprint of “Product architecture modularity implications for operations economy of green supply chains”," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 74(C), pages 63-80.
    7. Lopes, Thiago Cantos & Pastre, Giuliano Vidal & Michels, Adalberto Sato & Magatão, Leandro, 2020. "Flexible multi-manned assembly line balancing problem: Model, heuristic procedure, and lower bounds for line length minimization," Omega, Elsevier, vol. 95(C).
    8. Zhang, Sicheng & Li, Xiang & Zhang, Bowen & Wang, Shouyang, 2020. "Multi-objective optimisation in flexible assembly job shop scheduling using a distributed ant colony system," European Journal of Operational Research, Elsevier, vol. 283(2), pages 441-460.
    9. Gaby Pinto & Yariv Ben-Dov & Gad Rabinowitz, 2013. "Formulating and solving a multi-mode resource-collaboration and constrained scheduling problem (MRCCSP)," Annals of Operations Research, Springer, vol. 206(1), pages 311-339, July.
    10. Lopes, Thiago Cantos & Michels, Adalberto Sato & Sikora, Celso Gustavo Stall & Molina, Rafael Gobbi & Magatão, Leandro, 2018. "Balancing and cyclically sequencing synchronous, asynchronous, and hybrid unpaced assembly lines," International Journal of Production Economics, Elsevier, vol. 203(C), pages 216-224.
    11. Guo, Shouwei & Kang, Liying, 2010. "Online scheduling of malleable parallel jobs with setup times on two identical machines," European Journal of Operational Research, Elsevier, vol. 206(3), pages 555-561, November.
    12. Boudia, M. & Prins, C., 2009. "A memetic algorithm with dynamic population management for an integrated production-distribution problem," European Journal of Operational Research, Elsevier, vol. 195(3), pages 703-715, June.
    13. Alexandre Checoli Choueiri & Eduardo Alves Portela Santos, 2021. "Multi-product scheduling through process mining: bridging optimization and machine process intelligence," Journal of Intelligent Manufacturing, Springer, vol. 32(6), pages 1649-1667, August.
    14. Jonsson, Patrik & Kjellsdotter Ivert, Linea, 2015. "Improving performance with sophisticated master production scheduling," International Journal of Production Economics, Elsevier, vol. 168(C), pages 118-130.
    15. Thiago Cantos Lopes & Celso Gustavo Stall Sikora & Adalberto Sato Michels & Leandro Magatão, 2020. "Mixed-model assembly lines balancing with given buffers and product sequence: model, formulation comparisons, and case study," Annals of Operations Research, Springer, vol. 286(1), pages 475-500, March.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:203:y:2010:i:3:p:784-785. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.