IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v180y2007i2p963-969.html
   My bibliography  Save this article

A note on the first moment of makespan in an assembly shop

Author

Listed:
  • Schellhorn, Henry

Abstract

No abstract is available for this item.

Suggested Citation

  • Schellhorn, Henry, 2007. "A note on the first moment of makespan in an assembly shop," European Journal of Operational Research, Elsevier, vol. 180(2), pages 963-969, July.
  • Handle: RePEc:eee:ejores:v:180:y:2007:i:2:p:963-969
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377-2217(06)00391-2
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Jing-Sheng Song & Candace A. Yano & Panupol Lerssrisuriya, 2000. "Contract Assembly: Dealing with Combined Supply Lead Time and Demand Quantity Uncertainty," Manufacturing & Service Operations Management, INFORMS, vol. 2(3), pages 287-296, July.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Xiao, Yongbo & Chen, Jian & Lee, Chung-Yee, 2010. "Optimal decisions for assemble-to-order systems with uncertain assembly capacity," International Journal of Production Economics, Elsevier, vol. 123(1), pages 155-165, January.
    2. Yi Yang & Jianan Wang & Youhua Chen & Zhiyuan Chen & Yanchu Liu, 2020. "Optimal procurement strategies for contractual assembly systems with fluctuating procurement price," Annals of Operations Research, Springer, vol. 291(1), pages 1027-1059, August.
    3. Shi Chen & Hau Lee, 2017. "Incentive Alignment and Coordination of Project Supply Chains," Management Science, INFORMS, vol. 63(4), pages 1011-1025, April.
    4. Vernon Ning Hsu & Chung Yee Lee & Kut C. So, 2007. "Managing components for assemble‐to‐order products with lead‐time‐dependent pricing: The full‐shipment model," Naval Research Logistics (NRL), John Wiley & Sons, vol. 54(5), pages 510-523, August.
    5. Tiaojun Xiao & Xiangtong Qi, 2016. "A two-stage supply chain with demand sensitive to price, delivery time, and reliability of delivery," Annals of Operations Research, Springer, vol. 241(1), pages 475-496, June.
    6. Liming Liu & Mahmut Parlar & Stuart X. Zhu, 2007. "Pricing and Lead Time Decisions in Decentralized Supply Chains," Management Science, INFORMS, vol. 53(5), pages 713-725, May.
    7. Weixin Shang & Liming Liu, 2011. "Promised Delivery Time and Capacity Games in Time-Based Competition," Management Science, INFORMS, vol. 57(3), pages 599-610, March.
    8. Mehmood Khan & Matloub Hussain & Leopoldo Eduardo Cárdenas-Barrón, 2017. "Learning and screening errors in an EPQ inventory model for supply chains with stochastic lead time demands," International Journal of Production Research, Taylor & Francis Journals, vol. 55(16), pages 4816-4832, August.
    9. Vernon Ning Hsu & Chung Yee Lee & Kut C. So, 2006. "Optimal Component Stocking Policy for Assemble-to-Order Systems with Lead-Time-Dependent Component and Product Pricing," Management Science, INFORMS, vol. 52(3), pages 337-351, March.
    10. Anand Paul & Asoo J. Vakharia, 2006. "Requirements planning for modular products," Naval Research Logistics (NRL), John Wiley & Sons, vol. 53(5), pages 418-431, August.
    11. Zhu, Wanshan & Wu, Zhengping, 2014. "The stochastic ordering of mean-preserving transformations and its applications," European Journal of Operational Research, Elsevier, vol. 239(3), pages 802-809.
    12. Stuart J. Allen & Edmund W. Schuster, 2004. "Controlling the Risk for an Agricultural Harvest," Manufacturing & Service Operations Management, INFORMS, vol. 6(3), pages 225-236, July.
    13. Pan, Wenting & So, Kut C. & Xiao, Guang, 2022. "Benefits of backup sourcing for components in assembly systems under supply uncertainty," European Journal of Operational Research, Elsevier, vol. 302(1), pages 158-171.
    14. Ramesh Bollapragada & Uday S. Rao & Jun Zhang, 2004. "Managing Inventory and Supply Performance in Assembly Systems with Random Supply Capacity and Demand," Management Science, INFORMS, vol. 50(12), pages 1729-1743, December.
    15. Ke Fu & Vernon Ning Hsu & Chung-Yee Lee, 2006. "Inventory and Production Decisions for an Assemble-to-Order System with Uncertain Demand and Limited Assembly Capacity," Operations Research, INFORMS, vol. 54(6), pages 1137-1150, December.
    16. Golmohammadi, Amirmohsen & Taghavi, Majid & Farivar, Samira & Azad, Nader, 2018. "Three strategies for engaging a buyer in supplier development efforts," International Journal of Production Economics, Elsevier, vol. 206(C), pages 1-14.
    17. Yimin Wang & Brian Tomlin, 2009. "To wait or not to wait: Optimal ordering under lead time uncertainty and forecast updating," Naval Research Logistics (NRL), John Wiley & Sons, vol. 56(8), pages 766-779, December.
    18. Fang, Xin & Zhang, Cheng & Robb, David J. & Blackburn, Joseph D., 2013. "Decision support for lead time and demand variability reduction," Omega, Elsevier, vol. 41(2), pages 390-396.
    19. Ke Fu & Vernon N. Hsu & Chung-Yee Lee, 2009. "Note--Optimal Component Acquisition for a Single-Product, Single-Demand Assemble-to-Order Problem with Expediting," Manufacturing & Service Operations Management, INFORMS, vol. 11(2), pages 229-236, December.
    20. Liu, Liming & Xu, He & Zhu, Stuart X., 2020. "Push verse pull: Inventory-leadtime tradeoff for managing system variability," European Journal of Operational Research, Elsevier, vol. 287(1), pages 119-132.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:180:y:2007:i:2:p:963-969. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.