IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v164y2005i3p585-591.html
   My bibliography  Save this article

Chromatic scheduling in a cyclic open shop

Author

Listed:
  • Kubale, Marek
  • Nadolski, Adam

Abstract

No abstract is available for this item.

Suggested Citation

  • Kubale, Marek & Nadolski, Adam, 2005. "Chromatic scheduling in a cyclic open shop," European Journal of Operational Research, Elsevier, vol. 164(3), pages 585-591, August.
  • Handle: RePEc:eee:ejores:v:164:y:2005:i:3:p:585-591
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377-2217(04)00103-1
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. D. P. Williamson & L. A. Hall & J. A. Hoogeveen & C. A. J. Hurkens & J. K. Lenstra & S. V. Sevast'janov & D. B. Shmoys, 1997. "Short Shop Schedules," Operations Research, INFORMS, vol. 45(2), pages 288-294, April.
    2. Giaro, Krzysztof, 2001. "NP-hardness of compact scheduling in simplified open and flow shops," European Journal of Operational Research, Elsevier, vol. 130(1), pages 90-98, April.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Pempera, Jaroslaw & Smutnicki, Czeslaw, 2018. "Open shop cyclic scheduling," European Journal of Operational Research, Elsevier, vol. 269(2), pages 773-781.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Ahmadian, Mohammad Mahdi & Khatami, Mostafa & Salehipour, Amir & Cheng, T.C.E., 2021. "Four decades of research on the open-shop scheduling problem to minimize the makespan," European Journal of Operational Research, Elsevier, vol. 295(2), pages 399-426.
    2. Inna G. Drobouchevitch, 2021. "Three-machine open shop with a bottleneck machine revisited," Journal of Scheduling, Springer, vol. 24(2), pages 197-208, April.
    3. Antonina P. Khramova & Ilya Chernykh, 2021. "A new algorithm for the two-machine open shop and the polynomial solvability of a scheduling problem with routing," Journal of Scheduling, Springer, vol. 24(4), pages 405-412, August.
    4. Zeynep Adak & Mahmure Övül Arıoğlu Akan & Serol Bulkan, 0. "Multiprocessor open shop problem: literature review and future directions," Journal of Combinatorial Optimization, Springer, vol. 0, pages 1-23.
    5. Drobouchevitch, Inna G. & Strusevich, Vitaly A., 2001. "Two-stage open shop scheduling with a bottleneck machine," European Journal of Operational Research, Elsevier, vol. 128(1), pages 159-174, January.
    6. Jain, A. S. & Meeran, S., 1999. "Deterministic job-shop scheduling: Past, present and future," European Journal of Operational Research, Elsevier, vol. 113(2), pages 390-434, March.
    7. Drobouchevitch, I. G. & Strusevich, V. A., 2000. "Heuristics for the two-stage job shop scheduling problem with a bottleneck machine," European Journal of Operational Research, Elsevier, vol. 123(2), pages 229-240, June.
    8. F. Guerriero, 2008. "Hybrid Rollout Approaches for the Job Shop Scheduling Problem," Journal of Optimization Theory and Applications, Springer, vol. 139(2), pages 419-438, November.
    9. Jansen, Klaus & Mastrolilli, Monaldo & Solis-Oba, Roberto, 2005. "Approximation schemes for job shop scheduling problems with controllable processing times," European Journal of Operational Research, Elsevier, vol. 167(2), pages 297-319, December.
    10. Yong Chen & Yinhui Cai & Longcheng Liu & Guangting Chen & Randy Goebel & Guohui Lin & Bing Su & An Zhang, 2022. "Path cover with minimum nontrivial paths and its application in two-machine flow-shop scheduling with a conflict graph," Journal of Combinatorial Optimization, Springer, vol. 43(3), pages 571-588, April.
    11. Olivier Ploton & Vincent T’kindt, 2023. "Moderate worst-case complexity bounds for the permutation flowshop scheduling problem using Inclusion–Exclusion," Journal of Scheduling, Springer, vol. 26(2), pages 137-145, April.
    12. Nikhil Bansal & Tracy Kimbrel & Maxim Sviridenko, 2006. "Job Shop Scheduling with Unit Processing Times," Mathematics of Operations Research, INFORMS, vol. 31(2), pages 381-389, May.
    13. Zeynep Adak & Mahmure Övül Arıoğlu Akan & Serol Bulkan, 2020. "Multiprocessor open shop problem: literature review and future directions," Journal of Combinatorial Optimization, Springer, vol. 40(2), pages 547-569, August.
    14. C N Potts & V A Strusevich, 2009. "Fifty years of scheduling: a survey of milestones," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 60(1), pages 41-68, May.
    15. Han Hoogeveen & Petra Schuurman & Gerhard J. Woeginger, 2001. "Non-Approximability Results for Scheduling Problems with Minsum Criteria," INFORMS Journal on Computing, INFORMS, vol. 13(2), pages 157-168, May.
    16. D Bai & L Tang, 2010. "New heuristics for flow shop problem to minimize makespan," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 61(6), pages 1032-1040, June.
    17. Choi, Byung-Cheon & Yoon, Suk-Hun & Chung, Sung-Jin, 2007. "Minimizing maximum completion time in a proportionate flow shop with one machine of different speed," European Journal of Operational Research, Elsevier, vol. 176(2), pages 964-974, January.
    18. Nikhil Bansal & Mohammad Mahdian & Maxim Sviridenko, 2005. "Minimizing Makespan in No-Wait Job Shops," Mathematics of Operations Research, INFORMS, vol. 30(4), pages 817-831, November.
    19. Yuri N. Sotskov, 2020. "Mixed Graph Colorings: A Historical Review," Mathematics, MDPI, vol. 8(3), pages 1-24, March.
    20. Khatami, Mostafa & Salehipour, Amir & Cheng, T.C.E., 2020. "Coupled task scheduling with exact delays: Literature review and models," European Journal of Operational Research, Elsevier, vol. 282(1), pages 19-39.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:164:y:2005:i:3:p:585-591. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.