IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v123y2000i2p229-240.html
   My bibliography  Save this article

Heuristics for the two-stage job shop scheduling problem with a bottleneck machine

Author

Listed:
  • Drobouchevitch, I. G.
  • Strusevich, V. A.

Abstract

No abstract is available for this item.

Suggested Citation

  • Drobouchevitch, I. G. & Strusevich, V. A., 2000. "Heuristics for the two-stage job shop scheduling problem with a bottleneck machine," European Journal of Operational Research, Elsevier, vol. 123(2), pages 229-240, June.
  • Handle: RePEc:eee:ejores:v:123:y:2000:i:2:p:229-240
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377-2217(99)00253-2
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Inna G. Drobouchevitch & Vitaly A. Strusevich, 1998. "Heuristics for short route job shop scheduling problems," Mathematical Methods of Operations Research, Springer;Gesellschaft für Operations Research (GOR);Nederlands Genootschap voor Besliskunde (NGB), vol. 48(3), pages 359-375, December.
    2. D. P. Williamson & L. A. Hall & J. A. Hoogeveen & C. A. J. Hurkens & J. K. Lenstra & S. V. Sevast'janov & D. B. Shmoys, 1997. "Short Shop Schedules," Operations Research, INFORMS, vol. 45(2), pages 288-294, April.
    3. C. N. Potts & S. V. Sevast'janov & V. A. Strusevich & L. N. Van Wassenhove & C. M. Zwaneveld, 1995. "The Two-Stage Assembly Scheduling Problem: Complexity and Approximation," Operations Research, INFORMS, vol. 43(2), pages 346-355, April.
    4. Bo Chen & Celia A. Glass & Chris N. Potts & Vitaly A. Strusevich, 1996. "A New Heuristic for Three-Machine Flow Shop Scheduling," Operations Research, INFORMS, vol. 44(6), pages 891-898, December.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Mosheiov, Gur & Sarig, Assaf, 2010. "Minimum weighted number of tardy jobs on an m-machine flow-shop with a critical machine," European Journal of Operational Research, Elsevier, vol. 201(2), pages 404-408, March.
    2. Chatterjee A K & Mukherjee, Saral, 2006. "Unified Concept of Bottleneck," IIMA Working Papers WP2006-05-01, Indian Institute of Management Ahmedabad, Research and Publication Department.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Yong Chen & Yinhui Cai & Longcheng Liu & Guangting Chen & Randy Goebel & Guohui Lin & Bing Su & An Zhang, 2022. "Path cover with minimum nontrivial paths and its application in two-machine flow-shop scheduling with a conflict graph," Journal of Combinatorial Optimization, Springer, vol. 43(3), pages 571-588, April.
    2. C N Potts & V A Strusevich, 2009. "Fifty years of scheduling: a survey of milestones," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 60(1), pages 41-68, May.
    3. D Bai & L Tang, 2010. "New heuristics for flow shop problem to minimize makespan," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 61(6), pages 1032-1040, June.
    4. Jianming Dong & Ruyan Jin & Jueliang Hu & Guohui Lin, 2019. "A fully polynomial time approximation scheme for scheduling on parallel identical two-stage openshops," Journal of Combinatorial Optimization, Springer, vol. 37(2), pages 668-684, February.
    5. Jianming Dong & Joshua Chang & Bing Su & Jueliang Hu & Guohui Lin, 2020. "Two-stage open-shop scheduling with a two-machine flow shop as a stage: approximation algorithms and empirical experiments," Journal of Scheduling, Springer, vol. 23(5), pages 595-608, October.
    6. George L. Vairaktarakis, 2003. "The Value of Resource Flexibility in the Resource-Constrained Job Assignment Problem," Management Science, INFORMS, vol. 49(6), pages 718-732, June.
    7. Gupta, Jatinder N.D. & Koulamas, Christos & Kyparisis, George J., 2006. "Performance guarantees for flowshop heuristics to minimize makespan," European Journal of Operational Research, Elsevier, vol. 169(3), pages 865-872, March.
    8. Weiya Zhong & Yun Shi, 2018. "Two-stage no-wait hybrid flowshop scheduling with inter-stage flexibility," Journal of Combinatorial Optimization, Springer, vol. 35(1), pages 108-125, January.
    9. Inna G. Drobouchevitch, 2021. "Three-machine open shop with a bottleneck machine revisited," Journal of Scheduling, Springer, vol. 24(2), pages 197-208, April.
    10. Antonina P. Khramova & Ilya Chernykh, 2021. "A new algorithm for the two-machine open shop and the polynomial solvability of a scheduling problem with routing," Journal of Scheduling, Springer, vol. 24(4), pages 405-412, August.
    11. Yadong Wang & Baoqiang Fan & Jingang Zhai & Wei Xiong, 2019. "Two-machine flowshop scheduling in a physical examination center," Journal of Combinatorial Optimization, Springer, vol. 37(1), pages 363-374, January.
    12. Zeynep Adak & Mahmure Övül Arıoğlu Akan & Serol Bulkan, 0. "Multiprocessor open shop problem: literature review and future directions," Journal of Combinatorial Optimization, Springer, vol. 0, pages 1-23.
    13. Drobouchevitch, Inna G. & Strusevich, Vitaly A., 2001. "Two-stage open shop scheduling with a bottleneck machine," European Journal of Operational Research, Elsevier, vol. 128(1), pages 159-174, January.
    14. Jain, A. S. & Meeran, S., 1999. "Deterministic job-shop scheduling: Past, present and future," European Journal of Operational Research, Elsevier, vol. 113(2), pages 390-434, March.
    15. Sung, Chang Sup & Juhn, Jaeho, 2009. "Makespan minimization for a 2-stage assembly scheduling problem subject to component available time constraint," International Journal of Production Economics, Elsevier, vol. 119(2), pages 392-401, June.
    16. Sheikh, Shaya & Komaki, G.M. & Kayvanfar, Vahid & Teymourian, Ehsan, 2019. "Multi-Stage assembly flow shop with setup time and release time," Operations Research Perspectives, Elsevier, vol. 6(C).
    17. Koulamas, Christos & Kyparisis, George J., 2007. "A note on the two-stage assembly flow shop scheduling problem with uniform parallel machines," European Journal of Operational Research, Elsevier, vol. 182(2), pages 945-951, October.
    18. Koulamas, Christos & Kyparisis, George J., 2004. "Concurrent flowshop scheduling to minimize makespan," European Journal of Operational Research, Elsevier, vol. 156(2), pages 524-529, July.
    19. Hatami, Sara & Ruiz, Rubén & Andrés-Romano, Carlos, 2015. "Heuristics and metaheuristics for the distributed assembly permutation flowshop scheduling problem with sequence dependent setup times," International Journal of Production Economics, Elsevier, vol. 169(C), pages 76-88.
    20. F. Guerriero, 2008. "Hybrid Rollout Approaches for the Job Shop Scheduling Problem," Journal of Optimization Theory and Applications, Springer, vol. 139(2), pages 419-438, November.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:123:y:2000:i:2:p:229-240. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.