IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v120y2000i2p343-351.html
   My bibliography  Save this article

Complexity of mixed shop scheduling problems: A survey

Author

Listed:
  • Shakhlevich, Natalia V.
  • Sotskov, Yuri N.
  • Werner, Frank

Abstract

No abstract is available for this item.

Suggested Citation

  • Shakhlevich, Natalia V. & Sotskov, Yuri N. & Werner, Frank, 2000. "Complexity of mixed shop scheduling problems: A survey," European Journal of Operational Research, Elsevier, vol. 120(2), pages 343-351, January.
  • Handle: RePEc:eee:ejores:v:120:y:2000:i:2:p:343-351
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377-2217(99)00161-7
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. E. L. Lawler & J. K. Lenstra & A. H. G. Rinnooy Kan, 1981. "Minimizing Maximum Lateness in a Two-Machine Open Shop," Mathematics of Operations Research, INFORMS, vol. 6(1), pages 153-158, February.
    2. Sheldon B. Akers & Joyce Friedman, 1955. "A Non-Numerical Approach to Production Scheduling Problems," Operations Research, INFORMS, vol. 3(4), pages 429-442, November.
    3. Sotskov, Yu. N., 1991. "The complexity of shop-scheduling problems with two or three jobs," European Journal of Operational Research, Elsevier, vol. 53(3), pages 326-336, August.
    4. William W. Hardgrave & George L. Nemhauser, 1963. "A Geometric Model and a Graphical Algorithm for a Sequencing Problem," Operations Research, INFORMS, vol. 11(6), pages 889-900, December.
    5. V.A. Strusevich, 1997. "Shop scheduling problems under precedence constraints," Annals of Operations Research, Springer, vol. 69(0), pages 351-377, January.
    6. Yookun Cho & Sartaj Sahni, 1981. "Preemptive Scheduling of Independent Jobs with Release and Due Times on Open, Flow and Job Shops," Operations Research, INFORMS, vol. 29(3), pages 511-522, June.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Peter Brucker & Yu Sotskov & Frank Werner, 2007. "Complexity of shop-scheduling problems with fixed number of jobs: a survey," Mathematical Methods of Operations Research, Springer;Gesellschaft für Operations Research (GOR);Nederlands Genootschap voor Besliskunde (NGB), vol. 65(3), pages 461-481, June.
    2. Jianming Dong & Yong Chen & An Zhang & Qifan Yang, 2013. "A new three-machine shop scheduling: complexity and approximation algorithm," Journal of Combinatorial Optimization, Springer, vol. 26(4), pages 799-810, November.
    3. Mati, Yazid & Xie, Xiaolan, 2004. "The complexity of two-job shop problems with multi-purpose unrelated machines," European Journal of Operational Research, Elsevier, vol. 152(1), pages 159-169, January.
    4. Xiong, Hegen & Fan, Huali & Jiang, Guozhang & Li, Gongfa, 2017. "A simulation-based study of dispatching rules in a dynamic job shop scheduling problem with batch release and extended technical precedence constraints," European Journal of Operational Research, Elsevier, vol. 257(1), pages 13-24.
    5. Ahmadian, Mohammad Mahdi & Khatami, Mostafa & Salehipour, Amir & Cheng, T.C.E., 2021. "Four decades of research on the open-shop scheduling problem to minimize the makespan," European Journal of Operational Research, Elsevier, vol. 295(2), pages 399-426.
    6. Koulamas, Christos & Kyparisis, George J., 2015. "The three-machine proportionate open shop and mixed shop minimum makespan problems," European Journal of Operational Research, Elsevier, vol. 243(1), pages 70-74.
    7. Kis, Tamas, 2003. "Job-shop scheduling with processing alternatives," European Journal of Operational Research, Elsevier, vol. 151(2), pages 307-332, December.
    8. Burak Cankaya & Ezra Wari & Berna Eren Tokgoz, 2019. "Practical approaches to chemical tanker scheduling in ports: a case study on the Port of Houston," Maritime Economics & Logistics, Palgrave Macmillan;International Association of Maritime Economists (IAME), vol. 21(4), pages 559-575, December.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Agnetis, Alessandro & Kellerer, Hans & Nicosia, Gaia & Pacifici, Andrea, 2012. "Parallel dedicated machines scheduling with chain precedence constraints," European Journal of Operational Research, Elsevier, vol. 221(2), pages 296-305.
    2. Y N Sotskov & A Allahverdi & T-C Lai, 2004. "Flowshop scheduling problem to minimize total completion time with random and bounded processing times," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 55(3), pages 277-286, March.
    3. Liaw, Ching-Fang, 2005. "Scheduling preemptive open shops to minimize total tardiness," European Journal of Operational Research, Elsevier, vol. 162(1), pages 173-183, April.
    4. Jain, A. S. & Meeran, S., 1999. "Deterministic job-shop scheduling: Past, present and future," European Journal of Operational Research, Elsevier, vol. 113(2), pages 390-434, March.
    5. Mati, Yazid & Xie, Xiaolan, 2004. "The complexity of two-job shop problems with multi-purpose unrelated machines," European Journal of Operational Research, Elsevier, vol. 152(1), pages 159-169, January.
    6. Blazewicz, Jacek & Domschke, Wolfgang & Pesch, Erwin, 1996. "The job shop scheduling problem: Conventional and new solution techniques," European Journal of Operational Research, Elsevier, vol. 93(1), pages 1-33, August.
    7. Peter Damaschke, 2019. "Parameterized Mixed Graph Coloring," Journal of Combinatorial Optimization, Springer, vol. 38(2), pages 362-374, August.
    8. Yuri N. Sotskov, 2020. "Mixed Graph Colorings: A Historical Review," Mathematics, MDPI, vol. 8(3), pages 1-24, March.
    9. Timkovsky, Vadim G., 2003. "Identical parallel machines vs. unit-time shops and preemptions vs. chains in scheduling complexity," European Journal of Operational Research, Elsevier, vol. 149(2), pages 355-376, September.
    10. George Vairaktarakis & Sartaj Sahni, 1995. "Dual criteria preemptive open‐shop problems with minimum makespan," Naval Research Logistics (NRL), John Wiley & Sons, vol. 42(1), pages 103-121, February.
    11. A. Agnetis & P.B. Mirchandani & D. Pacciarelli & A. Pacifici, 2000. "Nondominated Schedules for a Job-Shop with Two Competing Users," Computational and Mathematical Organization Theory, Springer, vol. 6(2), pages 191-217, July.
    12. Peter Brucker & Yu Sotskov & Frank Werner, 2007. "Complexity of shop-scheduling problems with fixed number of jobs: a survey," Mathematical Methods of Operations Research, Springer;Gesellschaft für Operations Research (GOR);Nederlands Genootschap voor Besliskunde (NGB), vol. 65(3), pages 461-481, June.
    13. Ahmadian, Mohammad Mahdi & Khatami, Mostafa & Salehipour, Amir & Cheng, T.C.E., 2021. "Four decades of research on the open-shop scheduling problem to minimize the makespan," European Journal of Operational Research, Elsevier, vol. 295(2), pages 399-426.
    14. Matta, Marie E. & Elmaghraby, Salah E., 2010. "Polynomial time algorithms for two special classes of the proportionate multiprocessor open shop," European Journal of Operational Research, Elsevier, vol. 201(3), pages 720-728, March.
    15. Peleg, Bezalel & Peters, Hans & Storcken, Ton, 2002. "Nash consistent representation of constitutions: a reaction to the Gibbard paradox," Mathematical Social Sciences, Elsevier, vol. 43(2), pages 267-287, March.
    16. Tzafestas, Spyros & Triantafyllakis, Alekos, 1993. "Deterministic scheduling in computing and manufacturing systems: a survey of models and algorithms," Mathematics and Computers in Simulation (MATCOM), Elsevier, vol. 35(5), pages 397-434.
    17. A.A. Gladky & Y.M. Shafransky & V.A. Strusevich, 2004. "Flow Shop Scheduling Problems Under Machine–Dependent Precedence Constraints," Journal of Combinatorial Optimization, Springer, vol. 8(1), pages 13-28, March.
    18. Souren, Rainer & Gerlach, Kurt, 2007. "Graphische Verfahren zur Maschinenbelegungsplanung: Lösungsansätze für Probleme mit zwei Aufträgen und mehrdimensionale Erweiterungen," Ilmenauer Schriften zur Betriebswirtschaftslehre, Technische Universität Ilmenau, Institut für Betriebswirtschaftslehre, volume 1, number 12007.
    19. Hoogeveen, Han, 2005. "Multicriteria scheduling," European Journal of Operational Research, Elsevier, vol. 167(3), pages 592-623, December.
    20. Rossit, Daniel A. & Vásquez, Óscar C. & Tohmé, Fernando & Frutos, Mariano & Safe, Martín D., 2021. "A combinatorial analysis of the permutation and non-permutation flow shop scheduling problems," European Journal of Operational Research, Elsevier, vol. 289(3), pages 841-854.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:120:y:2000:i:2:p:343-351. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.